Saturday, March 21, 2009

Oh Boy! more construction photos

I took the kids on a walk around the old school last week and took a few photos.

The kids loved playing on the tennis courts and the bleachers and riding their scooters down the ramp behind the cafeteria, but were a little timid about walking past the signs that said, "Construction Area Do Not Enter." Rather than tell them how disappointed Joe Mackay would be, we pretty much stuck to pictures from outside the fences.

You can see a slideshow of some of the pictures below or see larger images by clicking through to the album.

Maybe I'll go back later and see if I can get some close ups. Joe, if you're out there, let me know when you are available.



Saturday, March 14, 2009

Plans for the New High School

Watching the growing bulk of buildings at Orem High School got me curious about just what the place is supposed to look like when it's all done, so I poked around online a little and found a few things.

This PDF on the school's website included a map of the plan that looks something like this (click the image for a larger view):


Here's a page from the website of Naylor Wentworth Lund Architects, the firm that designed the building. It includes a few renderings of what the finished product should look like on a day with dramatic clouds and semi-transparent students.

From the high school's website, a page with links to several renderings of the new building on a much less exciting day.

And finally, just for fun, from the high schools website, a now out of date picture of the construction from the air:

Thursday, February 19, 2009

OHS v2 Going Up

I had plans to take and post pictures of the progress of the construction at the high school, but it hasn't happened.

This evening I had a chance to stop by briefly and take a few shots. If you click on the images you should be able to see a larger view.

Here's one looking over what used to be the parking lot at the auditorium. You can see that they've poured the floor for a building of some kind.

This shot is looking north from just south of where the shops used to be over more of that cement floor they've poured. You can see the old smoke stack from the shops and some of the roof of the B-gym (remember C-gym was completely torn down) just left of the shell of a large new building they've been working on.

This picture is just a little to the right and east of that last one. The football field is in the middle of this picture, but hidden behind the new buildings they are putting up.

With any luck, in the next little while I'll get in and poke around the construction site. If I do, I'll post some more pictures.

Sunday, August 3, 2008

Digitizing Orem's Past

Here's an interesting article from the Salt Lake Tribune about a project underway to digitize and preserve old photos of Orem. The article begins with a story about Germans in a World War II era prisoner of war camp near the present-day location of Canyon View Junior High and ends with information about how to submit any photos you may want to donate.

Speaking of old photos of Orem, here are a couple of great ones of the construction of Geneva Steel with Mount Timpanogos in the background from the Library of Congress' donations to Flickr.

Thursday, July 31, 2008

A Call for Websites

Do you have a family or personal website or blog that you would like to let other members of the class know about? Send us the URL and we'll post it here and on the class website.

Sunday, July 27, 2008

OHS Construction Update #3

This past week we got a newsletter from the Alpine School District that included an update on bonding projects. Here's what it said about Orem High:
The construction on the rebuild of Orem High School on the existing property began in April. Partial demolition and the construction of parking lots and tennis courts started in June. The entire project is scheduled to be completed by July 2010.
I went by the other day to check it out and took a few pictures. I'll post a few below, but you'll find more here.

Here's a new parking lot they've added north of the school.


The hole that was the C-gym.


A shot from the north-west corner of the school lot showing the new parking lot they've added in front of the building.


Looking across the new parking lot at the welcoming main entrance.


Some people might be confused by this.


Looks like they are almost ready to pour the new tennis courts.


The remaining 3 tennis courts are getting new net posts and new fencing.


A little more parking behind the east bleachers.

Thursday, July 10, 2008

Orem High Contruction Update #2

Here are some more photos of what's going on at the high school. It's not as dramatic as the piles of rubble, but it's progress.

Looking south along the front of the school.


Would the person who stole the D from "Golden Tigers" please come to Mr Delaney's office?


Looking north from what used to be the parking lot.


What's left of the shops from the south-west corner of the lot.


What's left of the shops from what used to be the driving range.


The 3 remaining tennis courts and the football field from across a newly leveled portion of the former driving range.